During the last week of November 2009, I brave the stormy seas and the hot pricky sun to document Longzhu Group’s BoHai No.4 Oil Rig installation on Transshelf Vessel. It was worth all the troubles as it was an eye opening experience for me to climb on and explore the vessel, but never as great as capturing the whole installation process on photography.

The photos I’m sharing here are more of an artistic documentary from my point-of-view. Cheers & enjoy~ SET SAIL~!

Day 1: Constructing the basic structure for the oil rig to rest on.

Day 2: Oil Rig installation process.

Day 3: Stabilizing the oil rig onto the structure & vessel.

Advertisements